Tarheeltalker

The World’s Longest Bridge Project

I can remember crossing over the Herbert C Bonner bridge for the first time, sometime in the early 70’s. I was absolutely petrified. I had never crossed  a bridge that high and really wasn’t sure that I wanted to. After a number of crossings over the years, those feelings of terror gradually subsided. When I drove across last month on the way to Ocracoke, the crossing was rather routine. But the bridge itself, or its future, is anything but.

But we must needs go back a bit. The bridge was built way back in 1963 and named for  a long serving NC Congressman, Democrat Herbert Covington Bonner from Washington, NC who served 12 terms and actually died while still in office. His namesake  bridge then became  a memorial bridge.

The bridge as it stands is 2.5 miles long and allows vehicles to cross the  Oregon Inlet ( named for the first vessel to pass through it, the Oregon) and continue on to Hatteras Island. The bridge was designed to last 3o years and the plans to replace actually began in 1990, which as it turns out was not nearly soon enough. The talks and the environmental studies and environment impact statements have gone on and on and on.

The latest public hearings took place in Manteo last week and were something of a fine tuning. If all goes well and that is quite a large word in this case, construction  might just begin in 2 years and be completed by 2015. The cost is projected to be only $300 million and that statement I make in all sincerity. That is because this new 2.7 mile  bridge, landing a bit west of the current one was not everyone’s  #1 choice. A coalition of environmental agencies and groups favored a 17 mile long structure that would have cost a whopping $1.3 billion.  NC DOT spokesman Drew Joyner said it quite well when he sated that the state just could not afford it. That’;s a refreshing comment from  a government spokesman, is it not?

Granted there needed to be lots of studies and opportunity for comment, etc. After all, the bridge’s location is about the perfect storm for environmental issues. It’s near an ocean, a sound, a national refuge and a national park. And if things were not done just so, you can bet good money that a raft of  environmental lawyers would be lining up, briefcases in hand and palms outstretched.

Hear a few statements. NC DOT calls the bride “structurally deficient” but safe for travel. They are actually working hard right now at fixing weak spots. Kinda gives one just a small unsettled feeling though. And another from Beth Midgett who chairs the Citizens Action Committee to build Bonner Bridge. She says that public safety has to win out over bureaucracy at some point. It does, does it not? And finally, from Ken Sharp, Jr of Manteo who is “merely” a local citizen. Words of wisdom here. ” Just build me  a bridge, please.” Well said sir.

Advertisements

July 13, 2010 - Posted by | economy, Politics | , , , , , , , , , , , , ,

1 Comment »

  1. Reminds me of the old metal Cooper River Bridge in Charleston SC that has now been replaced with a cement one! It was all my old cars could do to climb to the top and it wasn’t any fun driving. I don’t know if you ever went over it, but it was tall and would shake up under you!
    http://www.contractortalk.com/f31/cooper-river-bridge-charleston-sc-50602/

    Comment by goodtimepolitics | July 14, 2010 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: